+355 4 24 20 138 info@ed-konstruksion.com

Reconstruction of the water supply network on the “Naim Frashëri “ Street ,Tirana .

Project Date : 07.04.2017 – 21.07.2017

Location : Tiranë, Shqipëri

Contracting investor :  Public

d

Category:  Public Job

Reconstruction of the water supply network on the “Naim Frashëri “ Street, Tirana.