Reconstruction of the water supply network on the “Naim Frashëri “ Street ,Tirana .
Project Date : 07.04.2017 – 21.07.2017
Location : Tiranë, Shqipëri
Contracting investor : Public
Category: Public Job
Reconstruction of the water supply network on the “Naim Frashëri “ Street, Tirana.
CONNECT WITH US THROUGH SOCIAL MEDIA